We have passed the 100′ mark on the pedestrian bridge tunnel installation at Mercedes Benz Stadium. 165′ to go, plus trim, RGB LED light fixtures and many hundreds of feet of handrail.
We have passed the 100′ mark on the pedestrian bridge tunnel installation at Mercedes Benz Stadium. 165′ to go, plus trim, RGB LED light fixtures and many hundreds of feet of handrail.